Hurricane hardening
Tile underlayment replacement in Pembroke Pines, FL
Your concrete tiles still look solid, but the felt underneath has dried out and cracked after 20 to 30 years, and new leaks appear with each storm.
- Open 24/7
- Based on Hiatus Road
- HVHZ-rated materials

- Real person on the line
- Visit booked on the same call
- Photos of what we find
Quick answer
Tile underlayment replacement, often called a tile lift and relay, removes the tiles, replaces the worn underlayment beneath them and resets the original tile. You need it when a 20 to 30 year old tile roof leaks in several places while the tile itself is sound. Typical South Florida cost runs $11,340 to $27,860 per home. Call (754) 226-1055, answered 24/7.
Tile underlayment replacement around Pembroke Pines
Concrete tile can last half a century or more, but the underlayment beneath it is what actually keeps water out, and in South Florida heat it wears out far sooner. Tiles shed most rain, then the underlayment handles everything that blows under them. Once that layer turns brittle, leaks show up at valleys, penetrations and low spots even though the roof looks fine from the street.
Many Pembroke Pines subdivisions built from the 1980s to the 2000s used concrete tile, and a large share of those roofs are now reaching underlayment age. Reusing sound tile can lower the cost and keeps the look of your home, while matched tiles replace the ones that break. Because the deck is exposed, it is also the right moment to re-nail it.
When to call
Signs it is time for tile underlayment replacement
Leaks in several rooms
Ceiling stains appear in more than one room, often below valleys or vents, rather than under a single cracked tile.
Tile roof past 20 years
The tile roof has not been touched since the house was built, or since a reroof two decades or more ago.
Brittle felt at eaves
Underlayment visible at the eaves or under a lifted tile crumbles or cracks when pressed instead of flexing back.
Tiles sliding out of line
Rows of tile shift or slide down the slope because old fasteners or mortar have let go of the deck below.
Repeated spot repairs
You have paid for patch repairs more than once in a few years and fresh leaks keep turning up in new places.
Insurer questions roof age
Your insurance company is asking about roof age or condition, and the original underlayment is the weakest part of the roof.
How the job runs
What happens on your roof
- 01
Lift and stack tile
Tiles are removed by hand, checked for cracks and stacked on the roof in balanced loads so the trusses are never overloaded.
- 02
Remove old underlayment
The worn felt, old flashings and fasteners are stripped down to the plywood deck and hauled away the same day.
- 03
Repair and re-nail deck
Damaged plywood is replaced and the deck is re-nailed with ring-shank nails to current code before anything new covers it.
- 04
Install self-adhered underlayment
A self-adhered underlayment approved for tile in the HVHZ goes down with new metal drip edge, valley and pipe flashings.
- 05
Reset tile and match
Tiles go back with foam adhesive or fasteners as the code and NOA require, and broken pieces are replaced with matched tiles.

Local factors that change this job
Pembroke Pines has thousands of concrete tile roofs on homes built from the 1980s through the 2000s, and many of them still sit on their original felt. Summer heat under the tile bakes that felt year after year. In the HVHZ, both the underlayment and the tile attachment method must follow Miami-Dade NOA or equivalent approvals, and the work needs a reroof permit with inspections. Reusing tile only works when the profile is still sound and enough matching pieces can be found.
Your options
Choices worth understanding first
Relay original tile
Your existing tile is reused over new underlayment. Usually the lowest cost route when most tiles are intact and the profile is still made or stocked locally.
Relay with blended tile
Original tile stays on the street-facing slopes and salvaged or new matching tile fills the rear, keeping the front view uniform where it shows most.
New tile over new underlayment
All tile is replaced. It costs more but resets the roof's age completely and lets you change the color or profile at the same time.
Switch to another material
Some owners move to metal or shingle at this stage. That changes structural loads and permit details, so we review the tradeoffs with you first.
Typical cost
What tile underlayment replacement costs in Pembroke Pines
| Lift, stack and relay labor | $6,870 to $14,290 |
| Self-adhered underlayment and flashings | $3,160 to $7,480 |
| Matched replacement tile, per square | $245 to $610 |
| Deck re-nailing and plywood | $740 to $2,860 |
Roof size and pitch set the base price. The breakage rate during lifting, how many matched tiles must be sourced, and deck repairs found after removal all move it. Hip roofs with many valleys take longer than simple gables. The final price is set after an on-roof look, including checking a few lifted tiles and the deck below them. Compare every service on the roofing price guide. Wondering where your roof sits on insurers’ age lists? Try the roof age check.
Questions
Tile underlayment replacement questions we hear
Concrete tile is dense and barely affected by sun, while felt underlayment is asphalt based and slowly dries out in the heat that builds up beneath the tile. After 20 to 30 years in South Florida the felt can crack and stop sealing around nails. The tile above may still have decades of life, which is why relaying it makes sense.
Some breakage is normal, especially on older tile and at hips and ridges where pieces were set in mortar. The amount depends on tile age, profile and how it was fastened. We look at a sample before pricing and plan for matched replacements, so the roof does not end up with patches that stand out.
Often, yes. Many common profiles are still made, and salvaged tile from other reroofs can fill gaps. When an exact match is not available, a common approach is to move original tile to the front slopes and use the closest match on rear slopes where it shows least.
A full lift and relay is a reroof, so it is permitted and built to current code anyway. The 2022 change matters more for partial work: if your existing roof was built to the 2007 Florida Building Code or later, repairing a damaged section only requires that portion to meet current code. Older roofs still fall under the 25 percent rule.
Related work
Often booked with this service
Concrete Tile Roofing
Your 1990s tile roof still looks solid from the street, but the underlayment beneath it has dried out and rain is now reaching the deck.
See this serviceTile Roof Repair
Cracked, slipped or loose tile leaves the underlayment open to sun and rain, and on a South Florida roof that exposed spot is where the next leak starts.
See this serviceRoof Deck Re-Nailing
Older roof decks were often fastened with staples or widely spaced smooth nails, so hurricane suction can lift whole plywood sheets right off the trusses.
See this serviceMore hurricane hardening services
Where we do this work most
Leak, storm damage or a roof that is simply getting old?
Call the roof line any hour. A real person answers, asks what you are seeing and sets the next step.