New roofs & replacement
Roof replacement in Pembroke Pines, FL
Your roof is aging out, leaks keep coming back after each repair, or your insurer wants proof of remaining roof life before it will renew the policy.
- Open 24/7
- Based on Hiatus Road
- HVHZ-rated materials

- Real person on the line
- Visit booked on the same call
- Photos of what we find
Quick answer
A roof replacement removes the old covering and underlayment down to the deck, re-nails the sheathing to current code and installs new HVHZ-approved materials. You need one when repairs stop holding or the underlayment has failed. Typical South Florida cost runs $9.40 to $24.80 per square foot depending on material. Call (754) 226-1055 any hour to set up an on-roof look.
Roof replacement around Pembroke Pines
Most Pembroke Pines homes sit under concrete tile, architectural shingle or metal, and each one ages differently in Broward heat. Shingles lose granules and curl after 15 to 20 years of UV. Tile can look fine from the street while the felt or peel-and-stick underneath has dried out and split. A replacement fixes the whole system at once instead of chasing one leak at a time.
Replacement is also the moment to change materials, add a secondary water barrier and upgrade roof-to-wall connections, items that can improve a wind mitigation report. Every reroof in Broward needs a permit, approved products and several inspections. Aurora Shield walks you through each stage, from tear-off to final, so you know what is happening on your roof and why it matters before the next storm season.
When to call
Signs it is time for roof replacement
Leaks after every storm
The same ceiling stain returns after each afternoon downpour even though that part of the roof has been patched more than once.
Underlayment past its life
Tile roofs from the 1990s often still have original underlayment that has dried, cracked and stopped shedding water below the tiles.
Insurer asking questions
Your carrier wants a roof inspection or a replacement because the covering is close to the end of its service life.
Soft or spongy decking
Walking the roof reveals soft spots where long-term moisture has weakened the plywood sheathing or rotted the edges near the fascia.
Heavy granule loss
Gutters and splash areas fill with granules, and bare black patches show where UV has worn the shingle surface away.
Planning a material change
You want to move from shingle to metal or tile for wind performance, appearance or a longer service life on the house.
How the job runs
What happens on your roof
- 01
On-roof assessment
We walk the roof, check the deck from the attic, measure every slope and explain which materials fit your house, budget and HOA rules.
- 02
Permit and product approvals
We pull the reroof permit with the building department and confirm every product on the job carries a current Miami-Dade NOA or HVHZ approval.
- 03
Tear-off and deck repair
The old covering comes off down to the sheathing, damaged plywood is replaced, and the deck is re-nailed to the current HVHZ nailing pattern.
- 04
Underlayment and new covering
Self-adhered underlayment goes down, the dry-in inspection is scheduled, then the new tile, shingle or metal is installed with new flashing throughout.
- 05
Final inspection and cleanup
The inspector signs off on the finished roof, magnets sweep the yard for nails, and you get photos plus the closed permit record for your files.

Local factors that change this job
Pembroke Pines sits inside the High Velocity Hurricane Zone, so every reroof here follows stricter rules than most of Florida. Products need Miami-Dade NOA or equivalent HVHZ approval, decks get a tighter nailing pattern, and the city requires a permit with separate inspections for dry-in and final. Many communities west of I-75, along with older subdivisions near Pines Boulevard, have HOA rules on roof color and material, so approval often comes before the permit. Scheduling around summer storms matters too, since an open roof cannot be left exposed overnight.
Your options
Choices worth understanding first
Concrete tile
Flat or S-profile concrete tile set with foam adhesive over self-adhered underlayment. It is the most common choice in Pembroke Pines and fits most HOA color palettes.
Architectural shingle
Laminated HVHZ-rated shingles with six-nail fastening over a self-adhered underlayment. The lowest upfront cost of the steep-slope options and a good fit for smaller homes.
Standing seam metal
Concealed-clip panels in Galvalume or aluminum with a factory paint finish. Handles wind uplift and heat well and outlasts shingle, at a higher upfront price.
Clay barrel tile
Kiln-fired clay in a two-piece or one-piece barrel profile. Holds its color for decades without fading, but weighs more and costs the most to install.
Typical cost
What roof replacement costs in Pembroke Pines
| Architectural shingle, tear-off and install | $7.85 to $12.40 per sq ft |
| Concrete tile, tear-off and install | $14.60 to $23.90 per sq ft |
| Plywood deck replacement | $4.35 to $7.90 per sq ft |
| Reroof permit and inspections | $640 to $1,870 per job |
Material is the biggest swing: shingle sits at the low end, concrete tile in the middle, and metal or clay at the top. Roof pitch, the number of valleys and penetrations, deck repairs found after tear-off and two-story access all add cost. Permit fees and debris hauling are listed in the written scope. The final price is set after an on-roof look and a measured slope count. Compare every service on the roofing price guide. Wondering where your roof sits on insurers’ age lists? Try the roof age check.
Questions
Roof replacement questions we hear
Most single-family homes take 3 to 8 working days on the roof itself. Shingle goes fastest, while tile and metal take longer. Inspection scheduling adds time, because the dry-in has to pass before tile or metal goes on. Special-order tile colors or metal panels can also add a week or two of waiting before work starts.
Not always. Under 2022 Florida law, if your existing roof was built to the 2007 Florida Building Code or later, only the damaged portion has to meet current code, even when 25 percent or more is repaired. Older roofs still fall under the 25 percent rule, so a large repair on one section can require replacing that whole section to current code.
Yes. Most families stay home through a reroof. Expect loud hammering and scraping during working hours, some dust falling in the attic and limited driveway access while the dumpster is on site. Keep pets inside or away for the day, move cars out of the drop zone, and take fragile items off walls that share the roof framing.
It can, but that decision belongs to your insurer, and we never promise a premium change or handle claims. A wind mitigation inspection after the reroof documents items such as roof covering, deck attachment, roof-to-wall connections and secondary water resistance. We give you the permit record, product approvals and photos so the inspector can verify what was installed.
Related work
Often booked with this service
Roof Inspection
You are not sure what shape your roof is really in after another storm season, and a small stain or loose tile has you wondering what else is hiding.
See this serviceRoof Deck Re-Nailing
Older roof decks were often fastened with staples or widely spaced smooth nails, so hurricane suction can lift whole plywood sheets right off the trusses.
See this serviceSecondary Water Barrier
When hurricane winds peel off shingles or crack tiles, rain pours through the bare plywood seams and soaks ceilings, insulation and drywall within minutes.
See this serviceMore new roofs & replacement services
- Concrete Tile
- Clay Barrel Tile
- Shingle Roofing
- Standing Seam Metal
- 5V Crimp Metal
- New Construction
- Patio & Porch Roofs
- Mobile Home Roofs
Where we do this work most
Leak, storm damage or a roof that is simply getting old?
Call the roof line any hour. A real person answers, asks what you are seeing and sets the next step.